Works on the Andriot paths in July 2026
In the heart of summer, we continue the necessary work on the Andriot trails, paying special attention to the markings and safety of the routes. We repaired and replaced posts and signs that had fallen.or worn out by winter and severe weather conditions, while we also carried out repeated cleanings in demanding sections of the network.
The image of the paths turning green and filling with life is always a small reward in the wholeeffort and let it mean more work to keep the trails open, clean and welcoming for everyone.
✳️ In more detail, the tasks carried out during the month,with the help of sponsored workers and volunteers:
Cleanings
They were carried out:
another cleaning for the 3rd time this year, in the Abyss section of route no. 17, where this year the vegetation grew impressively due to the continuous rains. (Luckily!)
cleaning of a section of the Arni circular route, Ar1, for the 2nd time this year
Signage maintenance
Central area of Chora
Route 1- Menites-installation of a fallen wallsignboard ,
Route 17 Livadia Circular-cleaning of part of route 17 Abyss
correction of an incorrectinstallation of a pillar near the canteen
Route1-Repositioning a fallen onesignboard: at the Menites – Messaria intersection,
DRoutes 2 and 10- Repositioning of fallen pole with signs and clearing of vegetation
Bmountainous area of Gavrio – Batsi
Route 16: Repositioning 2 pillars and varnishing signs near the Monastery of St.
Route15a- Reinstallation of a fallen pole and varnishing of signs
Route 15-Repositioning 4 postsand varnishing of signs in Ano Agios Petros